Behnken opened the second of two ammonia loops to allow coolant to flow through Tranquility and disconnected temporary power cables. Patrick installed heater and data cables from the new node to Pressurized Mating Adapter 3, now located on Tranquility?s outboard docking port.
Next the two spacewalker [...]
Full story at http://spacefellowship.com/news/art18601/patrick-behnken-complete-final-sts-130-spacewalk.html
No comments:
Post a Comment